Bradford Street closed between Simcoe Street and Vespra Street until December 23 for Bell Canada work; local access kept
Bradford Street in downtown Barrie is fully closed between Simcoe Street and Vespra Street from November 23 until 5 p.m. on December 23, 2026, for work by Avertex Utility Solutions on behalf of Bell Canada and the City. Through traffic follows a signed detour.
The update
- Bradford Street is fully closed between Simcoe Street and Vespra Street from 6 a.m. on November 23 until 5 p.m. on December 23, 2026, according to the City of Barrie.
- Local traffic keeps access; other traffic, including emergency vehicles, follows a detour via Victoria Street, Lakeshore Drive, Toronto Street and Simcoe Street.
- The work is by Avertex Utility Solutions on behalf of Bell Canada and the City, and the City says timelines may change with weather.
Why it matters. Drivers who use Bradford Street downtown between Simcoe Street and Vespra Street have to follow the signed detour until December 23 unless they are local traffic.
What is closed
The City of Barrie's road-closure record shows a full closure of Bradford Street from Simcoe Street to Vespra Street, in both directions. The closure took effect on November 23, 2026, from 6 a.m., and the City says the work will be completed by December 23, 2026, at 5 p.m.
The work is being carried out by Avertex Utility Solutions on behalf of Bell Canada and the City of Barrie. The City's record does not describe what the work involves. Access for local traffic is maintained throughout, so residents and businesses on the closed block can still be reached.
Detour
Through traffic, including emergency vehicles, follows the designated detour, which the City lists as Bradford Street to Victoria Street, Lakeshore Drive (continuing onto Toronto Street), Simcoe Street and back to Bradford Street. Detour signs are posted, and the City asks motorists to expect delays.
- Where
- Bradford Street, Simcoe Street to Vespra Street (both directions)
- Starts
- November 23, 2026, 6 a.m.
- Scheduled end
- December 23, 2026, 5 p.m.
- Local access
- Maintained
- Detour
- Victoria Street, Lakeshore Drive and Toronto Street, Simcoe Street
Related development nearby
The City's closure record links to its page for 125 Dunlop Street West and 40 Bradford Street, a Ward 2 site where Barrie Stadium Group Inc. has a site plan control application (file D11-019-2026) listed as proposed and under review, with the City as of August 20, 2026. The closure record itself names Bell Canada and the City as the parties the work is for.
The date
Dates as this story states them, each traced to its sources.
Spotted an error? We keep the URL, update the timestamp and record the change. Our corrections policy.