Summary

Any construction in Barrie that modifies, alters or adds structural components needs a building permit, and getting one is the law. You apply online through the City's APLI portal, and fees follow Schedule K of the Fees By-law, with a $178.48 minimum for a Part 9 residential building. Questions go to Service Barrie at 705-726-4242.

Last verified

Administered by the City of Barrie's Building Services department, led by the Chief Building Official. Every answer below was checked against its source on November 27, 2026; the source is linked under each one.


Do I need a permit?

What is a building permit for?

A building permit gives legal permission to begin construction, subject to any other municipal approvals, and makes sure the work will meet the minimum life and fire safety requirements of the Ontario Building Code. The City says any construction that modifies, alters or adds structural components always needs a permit, and that getting one is the law.

Source: City of Barrie, Residential Building Permits

Which home projects need a building permit in Barrie?

The City's list of projects that need a permit includes building or demolishing a house, addition or additional unit; any deck attached to a building or next to an exit door, whatever its size; porches and balconies; new door or window openings; removing load-bearing walls; basement walkouts and underpinning; adding a basement suite; sunrooms; roof changes such as dormers, skylights or solar panels; new HVAC systems; plumbing and drain work; and pool, hot tub or pond enclosures.

The lists are not exhaustive. If you are unsure, the City asks you to contact Service Barrie before you start.

Source: City of Barrie, Residential Building Permits

What can I do without a permit?

The City lists these as not needing a permit: replacing doors or windows with ones the same size, re-shingling with no added roof weight, replacing siding, painting and decorating, minor masonry repairs, kitchen or bathroom cupboards without plumbing, replacing a sink or toilet in the same spot, replacing a furnace with the same fuel type and capacity, adding air conditioning to an existing system, a gas fireplace, a pergola with no floor, roof or wall, and a privacy fence.

Work that does not need a building permit must still follow the Zoning By-law and other rules, such as setbacks and lot coverage.

Source: City of Barrie, Residential Building Permits

What should I check before I apply?

Before you begin, the City asks you to contact Service Barrie to confirm your project complies with section 5.3 of the Zoning By-law for setbacks and lot coverage and with your property's zoned use, and whether you also need a permit from a local conservation authority. Contact Ontario One Call to locate buried lines before any digging, even with a shovel.

Work that raises a property's assessed value may affect property taxes; the City points to the Municipal Property Assessment Corporation for details.

Source: City of Barrie, Residential Building Permits

What kinds of building permits are there?

Besides a full building permit, the City issues demolition permits, change of use permits (where a new use would increase the hazard), occupancy permits, and partial permits. A foundation-only permit lets footings and foundations start before the full permit is issued. A conditional permit may be issued by the Chief Building Official where unreasonable delays would otherwise occur, with the owner taking on all the risk.

A conditional building permit will not be considered for a Part 9 residential building.

Source: City of Barrie, Building Permit Types information sheet (November 2026)

When do I need a demolition permit?

A demolition permit is needed when a structure is being removed from a property completely; if any part of it will remain, you need an alteration permit instead. A demolition application needs the permit application through APLI, the Demolition Supplementary Information Form, a site plan drawing, owner consent if applicable, the fee, and Barrie Fire's Request for Demolition Approval.

A professional engineer is required if the building is more than 3 storeys or 600 square metres, has pre-tensioned or post-tensioned members, or demolishing it will undermine an adjacent structure.

Source: City of Barrie, Demolition Permits


Applying

How do I apply for a building permit in Barrie?

Apply online through APLI, the City's permit application tool. You can start an application and save it, get status updates and email notices, pay online up to $10,000, see reviewed drawings and your permit placard, and request inspections. Residential applications need applicable law documents, the Schedule 1 designer information form, owner consent if you are applying for someone else, and legible, to-scale drawings showing compliance with the Building Code, Building By-law and Zoning By-law.

Pool enclosure permits do not need the applicable law checklist or the Schedule 1 designer form.

Source: City of Barrie, Residential Building Permits

How much does a building permit cost in Barrie?

Fees are set by Schedule K of the Fees By-law and depend on the type of building, the scope of work and the total floor area, which counts all floors above and below grade plus decks and rooftop spaces people gather on. Every application also pays a non-refundable pre-screening fee. The total can never be less than the minimum fee for the building type.

Selected 2026 building permit fees, Fees By-law Schedule K

Selected 2026 building permit fees, Fees By-law Schedule K
Item2026 fee
Pre-screening (non-refundable)$20.00
Minimum fee, Part 9 residential building$178.48
New house or addition, Part 9 residential, per m2 (includes basement)$17.38
Alterations or repairs, Part 9 residential, per m2$8.19
Deck or porch without roof, not enclosed$208.08
Deck or porch with roof, not enclosed$310.00
Accessory structure, Part 9 residential, per m2 (minimum $178.48)$8.47
Demolition, up to 600 m2 and 3 storeys$392.88

Table source: City of Barrie, 2026 Fees By-law, Schedule K: Building Services

Development charges, zoning review and water meter fees may be charged on top of the permit fee.

Source: City of Barrie, Building Permit Fees & Refunds information sheet

What happens if work starts before the permit is issued?

Schedule K adds a surcharge to the permit application. For a Part 9 residential building where no stop work order has been issued, the surcharge is $178.48. If a stop work order is issued, the surcharge is 25 per cent of the total permit fee or at least $500, up to a maximum of $20,000. An Order to Comply costs $500.

Source: City of Barrie, 2026 Fees By-law, Schedule K: Building Services

Can I get a building permit refund?

If a permit is cancelled, withdrawn or reduced in scope, a refund is worked out under section 18 of the Building By-law, and the amount depends on how far the permit had progressed and whether a third-party review was done. There is no refund when an application is abandoned, an issued permit is revoked, or the calculated refund is less than the minimum permit fee.

Source: City of Barrie, Building Permit Fees & Refunds information sheet


Inspections and occupancy

How do I book a building inspection in Barrie?

Request inspections 24/7 in APLI under Building, Inspection Requests, giving the on-site contact's name and phone number, your email, the permit number and the inspection type. The inspector tries to call the morning after your request with a tentative date and time, and inspections happen within 2 business days, counted from the business day after the request.

Reschedule before 3 p.m. the day before the inspection; cancel before 7 a.m. Keep work exposed until it is inspected and have the issued plans on site.

Source: City of Barrie, Building Inspections

What happens if an inspection does not pass?

Results are emailed to the applicant, agent and site supervisor. Any result other than Passed needs follow-up: correct the deficiencies and request the next inspection, since it is the owner's responsibility to keep requesting inspections until the work passes. A re-inspection fee may apply under the Building By-law and the Fees By-law.

Questions about a result go to the assigned building inspector, or to building.official@barrie.ca if the inspector is unavailable.

Source: City of Barrie, Building Inspections

When can I move into a new house or addition?

New buildings and additions must be inspected before anyone occupies them, to confirm items related to occupant and building safety meet the minimum requirements. Ask your building inspector to confirm every required inspection is done and for documentation that your permit file is closed.

Source: City of Barrie, Building Inspections

Sources

Every factual claim above traces to one of these documents.

  1. City of Barrie

    Residential Building Permits

    Retrieved November 27, 2026

  2. City of Barrie

    Building Permit Types information sheet (November 2026)

    Retrieved November 27, 2026

  3. City of Barrie

    Demolition Permits

    Retrieved November 27, 2026

  4. City of Barrie

    Building Permit Fees & Refunds information sheet

    Published July 14, 2026 · Retrieved November 27, 2026

  5. City of Barrie

    2026 Fees By-law, Schedule K: Building Services

    Retrieved November 27, 2026

  6. City of Barrie

    Building Inspections

    Retrieved November 27, 2026