How many units a lot can have, the zoning standards, permits, registration and 2026 fee incentives.
Summary
Barrie allows up to four residential units on a residentially zoned lot, so a single detached, semi-detached or townhouse property can add up to three additional residential units, subject to zoning. Every ARU needs a building permit and one parking space per unit. For ARU applications submitted in 2026, the City cuts building permit application fees by 50 per cent and rebates the rest when the unit is finished within 12 months.
Last verified
Administered by the City of Barrie's Development Services and Building Services departments. Every answer below was checked against its source on November 27, 2026; the source is linked under each one.
What is allowed
What counts as an additional residential unit?
An ARU is a separate living space on the same property as the main house, with its own kitchen, bathroom and entrance. It can be inside the main house, attached to it, or detached, and either newly built or made by converting an accessory building. Common examples are a basement apartment or in-law suite, a coach house or secondary dwelling, and an addition built to hold a new unit.
Barrie permits up to four residential units per lot in residential zones, so you can add up to three ARUs to an existing home, subject to zoning compliance. Eligible property types are single detached homes, semi-detached homes, townhouses or rowhouses, and accessory buildings such as coach houses or garages. The lot must have a principal building with frontage on a municipal street.
An ARU may not be located in an area subject to natural hazards such as flooding or erosion.
You need at least one parking space per dwelling unit, each at least 5.5 metres long by 2.7 metres wide; spaces may be stacked in tandem, and your site plan must show parking for the existing units and the ARU. A 1.2-metre-wide unobstructed path must lead to the ARU's entrance from the street, driveway or parking area.
How big can a detached coach house or garden suite be?
In most residential zones, a detached building holding an ARU can be at most 4.5 metres tall, or the height of the main house if that is lower, and must be set back at least 7 metres from the front lot line and 3 metres from the side and rear lot lines, with landscaped buffers. It may not have a basement, may not sit in the front yard, may hold no more than two units, and counts toward the 10 per cent lot coverage limit for accessory buildings.
Maximum height (most zones)
4.5 m, or the main house's height if lower
Setbacks (most zones)
7 m front; 3 m side and rear
R5 and NMU zones use a separate table: 5.5 metres high, 7 metres front, 1.2 metres interior side and rear, and 1.5 metres exterior side. A lot may have at most two accessory buildings with ARUs, and an ARU's entrance can be no more than 40 metres from the front lot line.
Use the City's interactive mapping tool: turn on the Zoning By-law In Force layer under Land Use Planning, search your address and click your property to see its zone. The zone tells you which standards apply and where an ARU could go on your lot. For help, contact the City's Planner of the Day at 705-739-4220 ext. 4208 or planneroftheday@barrie.ca, or visit City Hall.
Do I need a building permit for a basement apartment or coach house?
Yes. Adding a unit within a building, adding a basement suite, and building a house, addition or additional residential unit all need a building permit, and the ARU must meet the Ontario Building Code. A permit is required even if you use one of the City's standardized detached ARU designs, so the design can be fitted to your lot and checked against the Zoning By-law and Building Code.
What if my property is near a creek or watercourse?
Check the conservation authority regulation maps linked from the City's ARU page. If your property is in a regulated area, you need a permit from the conservation authority before you apply for a building permit. Barrie is covered by two conservation authorities, and the City links the mapping for both.
Does an ARU need its own water and sewer connection?
No. ARUs must connect to municipal water and sewer where available, and only one connection per property is allowed. If upgrades are needed, such as larger pipes or new service lines on your property for a detached ARU, you pay for them and will likely need a Right of Way Activity permit for any work on the sidewalk, boulevard, road or driveway connection.
The unit must meet the Ontario Fire Code. Several Fire Code updates took effect January 1, 2026, including carbon monoxide alarms being required in more types of units. The City encourages owners to confirm smoke and CO alarm requirements for their property and to contact Barrie Fire and Emergency Service at fire.prevention@barrie.ca or 705-728-3199 with compliance questions.
Yes. The Additional Residential Units Registration By-law (2020-010) requires every ARU to be registered, so that agencies and City departments, including Barrie Fire and Emergency Service, know about the extra units. The City registers your unit automatically, gives it a municipal address and adds it to its map once you have built it and completed the required building permit inspections.
To report an ARU that is not registered, contact Service Barrie at 705-726-4242 or Service.Barrie@barrie.ca.
Yes. For new ARU permit applications submitted between January 1 and December 31, 2026, building permit application fees, including zoning and water fees, are cut by 50 per cent on your invoice. The remaining fees are rebated in full if the unit reaches occupancy, or final interior inspection for conversions, within 12 months of permit issuance and no later than December 31, 2027.
Submit the 2026 ARU incentive program form with your permit application in APLI, have the permit issued before December 31, 2026, and send the inspection report and permit placard to housingCIP@barrie.ca within 30 days of the inspection. The program ends early if funding runs out.
The reduction and rebate cover only the ARU part of a project. Not covered are the pre-screening fee, fees for the principal unit, decks, sheds, pools and other renovations, demolition and site servicing permits, development charges and parkland dedication, enforcement fees such as pre-permit surcharges, revision fees and re-inspection fees.
The Barrie Bonus is a one-time $15,000 City grant for homeowners approved for funding through the County of Simcoe's Secondary Suites Program, which offers up to $50,000 per unit for affordable ARUs. You apply to the County first; once it approves your funding, County staff give you the Barrie Bonus form and send it to the City, which signs a funding agreement with you and issues the cheque after your building permit is issued.
Funding is limited and first come, first served. The property must be in Barrie, on full municipal water and sewer, outside conservation authority regulated lands, with property taxes paid; you do not need to live there.