333 Bayview Dr
site plan
“SITE PLAN THAT WOULD FACILITATE THE ADDITION OF 1885.28M² TO THE EXISTING INDUSTRIAL BUILDING”
Where it stands
Stage from the City of Barrie’s status, November 28, 2026Final approval has been given or the plan has been registered.
How we know
Last checked November 28, 2026City of BarrieHow we know
- Publisher
- City of Barrie
- Source dataset
- Planning Applications (City of Barrie open data)
- Retrieved
- November 28, 2026
- Licence
- Open Government Licence – Barrie (version 1.0) Terms
- From the source
- the project and application names · file numbers · status · dates where recorded · the description of the proposal
- Derived by BarrieIQ
- the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
- BarrieIQ’s words
- the summary sentence
- Kept current
- Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.
Proposed, in the record's words: “SITE PLAN THAT WOULD FACILITATE THE ADDITION OF 1885.28M² TO THE EXISTING INDUSTRIAL BUILDING”. Latest dated step on the record: approval, August 22, 2016. File D11-1705. As of November 28, 2026 · City of Barrie
Data currency. Read from the City of Barrie source on November 28, 2026. The source publishes no last-edited date. Newest date on any record: November 20, 2026. Planning Applications (City of Barrie open data)
What is being asked
333 Bayview Dr is a site plan on the City of Barrie's record proposing 1,885 m² of floor space in Ward 8. It has received final approval or been registered.
What is proposed
SITE PLAN THAT WOULD FACILITATE THE ADDITION OF 1885.28M² TO THE EXISTING INDUSTRIAL BUILDING
The City of Barrie’s description of the application, as published.
The application
As the municipality records it.
Site plan
D11-1705
- Type
- Site plan (SITE PLAN)
- Status on the record
- REGISTERED
- Received
- May 17, 2016
- Approval
- August 22, 2016
- Land use (City's words)
- INDUSTRIAL
- Residential units (City's count)
- 0
- Industrial, commercial and institutional gross floor area, m² (City's figure)
- 1885.28
Filings since 2016
Approval
Site plan · D11-1705 · 2016
Application received
Site plan · D11-1705 · 2016
Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.
Other projects within 1 km
Development in Ward 8- This project
- Under review (1)
- Approved (6)
- Complete (6)
- 1 km
- 89 Big Bay Point RoadStage: ApprovedZoning by-law amendment · Ward 8 · 180 m
- 375 Bayview DriveStage: CompleteSite plan · Ward 8 · 220 m
- 80 Big Bay Point Road and 315 Bayview DriveStage: CompletePlan of subdivision · Ward 8 · 270 m
- 131 Big Bay Point RoadStage: CompleteSite plan · Ward 8 · 360 m
- 220 Fairview RoadStage: Under reviewSite plan · Ward 8 · 480 m
Statuses as the City of Barrie publishes them; distances straight-line from the file’s recorded point · November 28, 2026
Around the site
Community facilities nearby
- Allandale Recreation Centrerecreation or community centre, arena, indoor pool · 1.2 km
- Sadlon Arenaarena · 1.5 km
Schools, heritage and transit
Nearest schools
- Innisdale Secondary School · secondary school · 1.1 km
- Willow Landing Elementary School · elementary school · 1.4 km
- St Michael the Archangel Catholic Elementary School · elementary school · 1.6 km
Transit routes nearby(a published route path within 500 m, as the crow flies)
- Route 12A Georgian Mall · regular route · path 90 m away
- Route 12B Barrie South GO · regular route · path 110 m away
- Route 400 Express · express route · path 150 m away
Distances are between recorded positions, as the crow flies, not walking routes.
What the stages mean
- Stage: Pre-application
- Proposed to the municipality, but a complete application has not yet been received.
- Stage: Under review
- Filed with the municipality and being reviewed.
- Stage: Under appeal
- A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
- Stage: On hold
- The municipality lists the application as on hold, for example while it waits for more material.
- Stage: Approved
- The application has been approved. Building may not have started.
- Stage: Complete
- Final approval has been given or the plan has been registered.333 Bayview Dr is here.
- Stage: Closed
- The municipality has closed this application file. The record lists what was recorded.
- Stage: Refused
- The application was refused.
Sources
- 01Planning Applications (City of Barrie open data) — checked November 28, 2026
Contains information licensed under the Open Government Licence – Barrie. Open Government Licence – Barrie (version 1.0). Figures are the municipality’s records at the date checked; a later submission can change them.
How we draw the diagram
The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.