131 Big Bay Point Road
site plan
“SITE PLAN THAT WOULD FACILITATE THE CONSTRUCTION OF A COMBINATION OFFICE AND REPAIR FACILITY.”
Where it stands
Stage from the City of Barrie’s status, November 28, 2026Final approval has been given or the plan has been registered.
How we know
Last checked November 28, 2026City of BarrieHow we know
- Publisher
- City of Barrie
- Source dataset
- Planning Applications (City of Barrie open data)
- Retrieved
- November 28, 2026
- Licence
- Open Government Licence – Barrie (version 1.0) Terms
- From the source
- the project and application names · file numbers · status · dates where recorded · the description of the proposal
- Derived by BarrieIQ
- the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
- BarrieIQ’s words
- the summary sentence
- Kept current
- Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.
Proposed, in the record's words: “SITE PLAN THAT WOULD FACILITATE THE CONSTRUCTION OF A COMBINATION OFFICE AND REPAIR FACILITY”. Latest dated step on the record: application received, April 3, 2019. File D11-004-2019. As of November 28, 2026 · City of Barrie
Data currency. Read from the City of Barrie source on November 28, 2026. The source publishes no last-edited date. Newest date on any record: November 20, 2026. Planning Applications (City of Barrie open data)
What is being asked
131 Big Bay Point Road is a site plan on the City of Barrie's record proposing 1,208 m² of floor space in Ward 8. It has received final approval or been registered.
What is proposed
SITE PLAN THAT WOULD FACILITATE THE CONSTRUCTION OF A COMBINATION OFFICE AND REPAIR FACILITY.
The City of Barrie’s description of the application, as published.
The application
As the municipality records it.
Site plan
D11-004-2019
- Type
- Site plan (SITE PLAN)
- Status on the record
- REGISTERED
- Received
- April 3, 2019
- Approval
- March 4, 2019
- Land use (City's words)
- COMMERCIAL
- Residential units (City's count)
- 0
- Industrial, commercial and institutional gross floor area, m² (City's figure)
- 1208
Filings since 2019
Application received
Site plan · D11-004-2019 · 2019
Approval
Site plan · D11-004-2019 · 2019
Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.
Other projects within 1 km
Development in Ward 8- This project
- Under review (1)
- Approved (4)
- Complete (8)
- 1 km
- 375 Bayview DriveStage: CompleteSite plan · Ward 8 · 310 m
- 333 Bayview DrStage: CompleteSite plan · Ward 8 · 360 m
- 89 Big Bay Point RoadStage: ApprovedZoning by-law amendment · Ward 8 · 380 m
- 80 Big Bay Point Road and 315 Bayview DriveStage: CompletePlan of subdivision · Ward 8 · 400 m
- 421 Bayview DriveStage: ApprovedSite plan · Ward 8 · 590 m
Statuses as the City of Barrie publishes them; distances straight-line from the file’s recorded point · November 28, 2026
Around the site
Parks nearby
- Lennox ParkCommunity · ball diamond, basketball court · 890 m
- Huronia North ParkNeighbourhood · playground, soccer field · 990 m
Community facilities nearby
- Sadlon Arenaarena · 1.4 km
- Allandale Recreation Centrerecreation or community centre, arena, indoor pool · 1.5 km
Schools, heritage and transit
Nearest schools
- Willow Landing Elementary School · elementary school · 1.1 km
- St Michael the Archangel Catholic Elementary School · elementary school · 1.3 km
- Innisdale Secondary School · secondary school · 1.3 km
Transit routes nearby(a published route path within 500 m, as the crow flies)
- Route 12A Georgian Mall · regular route · path 350 m away
- Route 12B Barrie South GO · regular route · path 370 m away
- Route 8A Rvh/Yonge · regular route · path 400 m away
2 more within that distance; all of them.
Distances are between recorded positions, as the crow flies, not walking routes.
What the stages mean
- Stage: Pre-application
- Proposed to the municipality, but a complete application has not yet been received.
- Stage: Under review
- Filed with the municipality and being reviewed.
- Stage: Under appeal
- A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
- Stage: On hold
- The municipality lists the application as on hold, for example while it waits for more material.
- Stage: Approved
- The application has been approved. Building may not have started.
- Stage: Complete
- Final approval has been given or the plan has been registered.131 Big Bay Point Road is here.
- Stage: Closed
- The municipality has closed this application file. The record lists what was recorded.
- Stage: Refused
- The application was refused.
Sources
- 01Planning Applications (City of Barrie open data) — checked November 28, 2026
Contains information licensed under the Open Government Licence – Barrie. Open Government Licence – Barrie (version 1.0). Figures are the municipality’s records at the date checked; a later submission can change them.
How we draw the diagram
The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.