Skip to content
BarrieIQ
Development application D11-026-2017 · Ward 9

521, 527, 531 Big Bay Point Road

site plan

Stage: CompleteOn the record: “REGISTERED”Filed October 16, 2017
“SITE PLAN THAT WOULD FACILITATE THE DEVELOPMENT OF 58 BACK-TO-BACK TOWNHOUSES IN 3 SEPARATE BUILDINGS”
The City of Barrie’s description, in its own words · checked November 28, 2026
The City’s file page

Where it stands

Stage from the City of Barrie’s status, November 28, 2026

Final approval has been given or the plan has been registered.

Diagram of the zoning around 521, 527, 531 Big Bay Point RoadThe municipality's zoning polygons within about 140 metres of the file's recorded point; the point falls in a zone coded RM2. A diagram, not to scale and not a survey: no building or design is drawn.C4C4C4C4I-ER1R1R1R1RA1-2Diagram, not to scaleCity of Barrie zoning and planning open data
Zoning areas around the site; the recorded point falls in RM2 today, which is the zone, not the proposal. Streets show as the gaps between zones. No building or design is drawn. File D11-026-2017.
58
homes proposed
City of Barrie record
1
application in this project: site plan
City of Barrie record
2
dated steps on the record; the latest April 14, 2018
Checked November 28, 2026
How we know
Last checked November 28, 2026City of BarrieHow we know
Publisher
City of Barrie
Source dataset
Planning Applications (City of Barrie open data)
Official record
The municipality's own page for this project
Retrieved
November 28, 2026
Licence
Open Government Licence – Barrie (version 1.0) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by BarrieIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
BarrieIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “SITE PLAN THAT WOULD FACILITATE THE DEVELOPMENT OF 58 BACK-TO-BACK TOWNHOUSES IN 3 SEPARATE BUILDINGS”. Latest dated step on the record: approval, April 14, 2018. File D11-026-2017. As of November 28, 2026 · City of Barrie

Data currency. Read from the City of Barrie source on November 28, 2026. The source publishes no last-edited date. Newest date on any record: November 20, 2026. Planning Applications (City of Barrie open data)

What is being asked

One application

521, 527, 531 Big Bay Point Road is a site plan on the City of Barrie's record proposing 58 homes in Ward 9. It has received final approval or been registered.

What is proposed

SITE PLAN THAT WOULD FACILITATE THE DEVELOPMENT OF 58 BACK-TO-BACK TOWNHOUSES IN 3 SEPARATE BUILDINGS

The City of Barrie’s description of the application, as published.

The application

As the municipality records it.

  1. Site plan

    D11-026-2017

    Type
    Site plan (SITE PLAN)
    Status on the record
    REGISTERED
    Received
    October 16, 2017
    Approval
    April 14, 2018
    Land use (City's words)
    RESIDENTIAL
    Residential units (City's count)
    58
    Homes proposed
    58

Filings since 2017

Every dated item on the record
Dated steps on the record for 521, 527, 531 Big Bay Point Road2017-10-16: Application received (Site plan); 2018-04-14: Approval (Site plan).2017-10-16: Application received2018-04-14: Approval
  1. Approval

    Site plan · D11-026-2017 · 2018

  2. Application received

    Site plan · D11-026-2017 · 2017

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

Other projects within 1 km

Development in Ward 9
521, 527, 531 Big Bay Point Road and other planning files within 1 km521, 527, 531 Big Bay Point Road (ringed) and 12 other significant files on the City of Barrie's record within 1 km, over the zoning layer.520 & 526 Big Bay Point · Approved · 90 m515 Big Bay Point Road and 623 Yonge Street · Approved · 110 m545–565 Big Bay Point Road, 218 Ashford Drive, 207–209 Montgomery Drive & 200–210 Bertha Avenue · Approved · 220 m211 Warnica Road · Under review · 250 m667, 669, 673 & 675 Yonge Street · Approved · 250 m60 Dean Avenue · Complete · 340 m48 Dean Avenue · Approved · 340 m681, 685 Yonge Street · Complete · 340 m70 Dean Avenue · Complete · 360 m435 Big Bay Point Road · Approved · 690 m91 and 110 Turnberry Lane · Complete · 920 m505, 511, 515 & 533 Yonge Street · Under review · 950 m1 km around the siteCity of Barrie open data
  • This project
  • Under review (2)
  • Approved (6)
  • Complete (4)
  • 1 km

Statuses as the City of Barrie publishes them; distances straight-line from the file’s recorded point · November 28, 2026

Around the site

521, 527, 531 Big Bay Point Road
Aerial view of 521, 527, 531 Big Bay Point Road, Barrie
Contains information licensed under the Open Government Licence – Ontario

Parks nearby

Community facilities nearby

Schools, heritage and transit

Nearest schools

Transit routes nearby(a published route path within 500 m, as the crow flies)

1 more within that distance; all of them.

Distances are between recorded positions, as the crow flies, not walking routes.

What the stages mean

The same words on every BarrieIQ project
Stage: Pre-application
Proposed to the municipality, but a complete application has not yet been received.
Stage: Under review
Filed with the municipality and being reviewed.
Stage: Under appeal
A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
Stage: On hold
The municipality lists the application as on hold, for example while it waits for more material.
Stage: Approved
The application has been approved. Building may not have started.
Stage: Complete
Final approval has been given or the plan has been registered.521, 527, 531 Big Bay Point Road is here.
Stage: Closed
The municipality has closed this application file. The record lists what was recorded.
Stage: Refused
The application was refused.

Sources

  1. 01City of Barrie page for this project — the current proposal, notices and reports
  2. 02Planning Applications (City of Barrie open data) — checked November 28, 2026

Contains information licensed under the Open Government Licence – Barrie. Open Government Licence – Barrie (version 1.0). Figures are the municipality’s records at the date checked; a later submission can change them.

How we draw the diagram

The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.

More