359 Tiffin Street
site plan
“SITE PLAN APPLICATION TO FACILITATE THE DEMOLITION OF THE EXISTING 355M² BUILDING AND CONSTRUCTION OF A NEW 2-STOREY BUILDING WITH A TOTAL GFA OF 1,281M², INCLUSIVE OF 1,115M² OF WAREHOUSE USE ON THE GROUND FLOOR AND 166M² OF ACCESSORY OFFICE USE ON THE SECOND FLOOR TO SERVE THE EXISTING MATERIAL RECOVERY FACILITY ON THE SITE. THE PROPERTY IS ZONED RESTRICTED INDUSTRIAL (RI).”
Where it stands
Stage from the City of Barrie’s status, November 28, 2026The application has been approved. Building may not have started.
How we know
Last checked November 28, 2026City of BarrieHow we know
- Publisher
- City of Barrie
- Source dataset
- Planning Applications (City of Barrie open data)
- Official record
- The municipality's own page for this project
- Retrieved
- November 28, 2026
- Licence
- Open Government Licence – Barrie (version 1.0) Terms
- From the source
- the project and application names · file numbers · status · dates where recorded · the description of the proposal
- Derived by BarrieIQ
- the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
- BarrieIQ’s words
- the summary sentence
- Kept current
- Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.
Proposed, in the record's words: “SITE PLAN APPLICATION TO FACILITATE THE DEMOLITION OF THE EXISTING 355M² BUILDING AND CONSTRUCTION OF A NEW 2-STOREY BUILDING WITH A TOTAL GFA OF 1,281M², INCLUSIVE OF 1,115M² OF WAREHOUSE USE ON THE GROUND FLOOR AND…”. Latest dated step on the record: approval, June 17, 2025. File D11-031-2024. As of November 28, 2026 · City of Barrie
Data currency. Read from the City of Barrie source on November 28, 2026. The source publishes no last-edited date. Newest date on any record: November 20, 2026. Planning Applications (City of Barrie open data)
What is being asked
359 Tiffin Street is a site plan on the City of Barrie's record proposing 1,281 m² of floor space in Ward 6. It has been approved.
What is proposed
SITE PLAN APPLICATION TO FACILITATE THE DEMOLITION OF THE EXISTING 355M² BUILDING AND CONSTRUCTION OF A NEW 2-STOREY BUILDING WITH A TOTAL GFA OF 1,281M², INCLUSIVE OF 1,115M² OF WAREHOUSE USE ON THE GROUND FLOOR AND 166M² OF ACCESSORY OFFICE USE ON THE SECOND FLOOR TO SERVE THE EXISTING MATERIAL RECOVERY FACILITY ON THE SITE. THE PROPERTY IS ZONED RESTRICTED INDUSTRIAL (RI).
The City of Barrie’s description of the application, as published.
The application
As the municipality records it.
Site plan
D11-031-2024
- Type
- Site plan (SITE PLAN)
- Status on the record
- APPROVED
- Received
- October 3, 2024
- Approval
- June 17, 2025
- Land use (City's words)
- INDUSTRIAL
- Residential units (City's count)
- 0
- Industrial, commercial and institutional gross floor area, m² (City's figure)
- 1281
Filings since 2024
Approval
Site plan · D11-031-2024 · 2025
Application received
Site plan · D11-031-2024 · 2024
The record shows nothing dated after June 17, 2025; the next recorded step appears here when the municipality enters it.
Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.
Other projects within 1 km
Development in Ward 6- This project
- Complete (6)
- 1 km
- 21 & 25 Ferndale Drive NorthStage: CompleteSite plan · Ward 5 · 290 m
- 46, 50, 52, 56 Patterson RoadStage: CompleteSite plan · Ward 6 · 360 m
- 412 Tiffin Street & 26 Ferndale Drive NorthStage: CompleteSite plan · Ward 5 · 420 m
- 31 Patterson RoadStage: CompleteSite plan · Ward 6 · 440 m
- 35 Fraser CourtStage: CompleteSite plan · Ward 6 · 840 m
Statuses as the City of Barrie publishes them; distances straight-line from the file’s recorded point · November 28, 2026
Around the site
Parks nearby
- Patterson Place ParkNeighbourhood · playground · 850 m
- Ferndale ParkNeighbourhood · basketball court, playground · 900 m
- Elizabeth ParkNeighbourhood · playground, soccer field · 910 m
Schools, heritage and transit
Nearest schools
- Ferndale Woods Elementary School · elementary school · 1.2 km
- St Catherine of Siena School · elementary school · 1.6 km
- St John Vianney Separate School · elementary school · 1.7 km
Transit routes nearby(a published route path within 500 m, as the crow flies)
- Route 2A Dunlop · regular route · path 150 m away
- Route 2B Park Place · regular route · path 160 m away
- Route 7B Bear Creek · regular route · path 290 m away
2 more within that distance; all of them.
Distances are between recorded positions, as the crow flies, not walking routes.
What the stages mean
- Stage: Pre-application
- Proposed to the municipality, but a complete application has not yet been received.
- Stage: Under review
- Filed with the municipality and being reviewed.
- Stage: Under appeal
- A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
- Stage: On hold
- The municipality lists the application as on hold, for example while it waits for more material.
- Stage: Approved
- The application has been approved. Building may not have started.359 Tiffin Street is here.
- Stage: Complete
- Final approval has been given or the plan has been registered.
- Stage: Closed
- The municipality has closed this application file. The record lists what was recorded.
- Stage: Refused
- The application was refused.
Sources
- 01City of Barrie page for this project — the current proposal, notices and reports
- 02Planning Applications (City of Barrie open data) — checked November 28, 2026
Contains information licensed under the Open Government Licence – Barrie. Open Government Licence – Barrie (version 1.0). Figures are the municipality’s records at the date checked; a later submission can change them.
How we draw the diagram
The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.