Skip to content
BarrieIQ
Development application D11-029-2020 · Ward 8

149 Caplan Avenue

site plan

Stage: CompleteOn the record: “REGISTERED”Filed December 29, 2020
“SITE PLAN THAT WOULD FACILITATE THE CONSTRUCTION OF A NEW INDUSTRIAL BUILDING ON VACANT LAND; TO BE A MULTI-TENANT BUILDING”
The City of Barrie’s description, in its own words · checked November 28, 2026
The City’s file page

Where it stands

Stage from the City of Barrie’s status, November 28, 2026

Final approval has been given or the plan has been registered.

Diagram of the zoning around 149 Caplan AvenueThe municipality's zoning polygons within about 140 metres of the file's recorded point; the point falls in a zone coded BP. A diagram, not to scale and not a survey: no building or design is drawn.BPDiagram, not to scaleCity of Barrie zoning and planning open data
Zoning areas around the site; the recorded point falls in BP today, which is the zone, not the proposal. Streets show as the gaps between zones. No building or design is drawn. File D11-029-2020.
6,925m²
non-residential floor area
City of Barrie record
1
application in this project: site plan
City of Barrie record
2
dated steps on the record; the latest April 9, 2021
Checked November 28, 2026
How we know
Last checked November 28, 2026City of BarrieHow we know
Publisher
City of Barrie
Source dataset
Planning Applications (City of Barrie open data)
Official record
The municipality's own page for this project
Retrieved
November 28, 2026
Licence
Open Government Licence – Barrie (version 1.0) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by BarrieIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
BarrieIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “SITE PLAN THAT WOULD FACILITATE THE CONSTRUCTION OF A NEW INDUSTRIAL BUILDING ON VACANT LAND; TO BE A MULTI-TENANT BUILDING”. Latest dated step on the record: approval, April 9, 2021. File D11-029-2020. As of November 28, 2026 · City of Barrie

Data currency. Read from the City of Barrie source on November 28, 2026. The source publishes no last-edited date. Newest date on any record: November 20, 2026. Planning Applications (City of Barrie open data)

What is being asked

One application

149 Caplan Avenue is a site plan on the City of Barrie's record proposing 6,925 m² of floor space in Ward 8. It has received final approval or been registered.

What is proposed

SITE PLAN THAT WOULD FACILITATE THE CONSTRUCTION OF A NEW INDUSTRIAL BUILDING ON VACANT LAND; TO BE A MULTI-TENANT BUILDING

The City of Barrie’s description of the application, as published.

The application

As the municipality records it.

  1. Site plan

    D11-029-2020

    Type
    Site plan (SITE PLAN)
    Status on the record
    REGISTERED
    Received
    December 29, 2020
    Approval
    April 9, 2021
    Land use (City's words)
    INDUSTRIAL
    Residential units (City's count)
    0
    Industrial, commercial and institutional gross floor area, m² (City's figure)
    6924.8

Filings since 2020

Every dated item on the record
Dated steps on the record for 149 Caplan Avenue2020-12-29: Application received (Site plan); 2021-04-09: Approval (Site plan).2020-12-29: Application received2021-04-09: Approval
  1. Approval

    Site plan · D11-029-2020 · 2021

  2. Application received

    Site plan · D11-029-2020 · 2020

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

Other projects within 1 km

Development in Ward 8
149 Caplan Avenue and other planning files within 1 km149 Caplan Avenue (ringed) and 22 other significant files on the City of Barrie's record within 1 km, over the zoning layer.35 Reid Drive · Complete · 100 m55 Reid Dr · Complete · 190 m500 Veteran'S Drive · Complete · 200 m204 Mapleview Drive West · Approved · 380 m570, 574, 576 Essa Road · Approved · 470 m222 Mapleview Drive West · Complete · 480 m570, 552, 558, 570, 574 & 576 Essa Road · Under review · 480 m582 Essa Road · Approved · 480 m558 Essa Road (Before Known As 556, 560, 568 Essa Road) · Approved · 480 m556, 560, 568 Essa Road (Now Known As 558 Essa Road) · Approved · 480 m550 & 552 Essa Road · Approved · 510 m300 Mapleview Drive West · Complete · 540 m201 Mapleview Drive West · Under review · 580 m521 & 525 Essa Road · Complete · 710 m90 Mapleview Drive West · Complete · 730 m440 Veteran'S Drive 104 White Crs · Approved · 740 m674 Essa Road · Approved · 800 m645 Veterans Drive · Complete · 860 m320 & 364 Mapleview Drive West and 664, 674 & 692 Essa Road · Under review · 880 m112 King Street · Approved · 910 m315 & 323 Mapleview Drive West · Complete · 990 m315 and 323 Mapleview Drive West · Approved · 990 m1 km around the siteCity of Barrie open data
  • This project
  • Under review (3)
  • Approved (10)
  • Complete (9)
  • 1 km

Statuses as the City of Barrie publishes them; distances straight-line from the file’s recorded point · November 28, 2026

Around the site

149 Caplan Avenue
Aerial view of 149 Caplan Avenue, Barrie
Contains information licensed under the Open Government Licence – Ontario

Parks nearby

Community facilities nearby

Schools, heritage and transit

Nearest schools

Transit routes nearby(a published route path within 500 m, as the crow flies)

3 more within that distance; all of them.

Distances are between recorded positions, as the crow flies, not walking routes.

What the stages mean

The same words on every BarrieIQ project
Stage: Pre-application
Proposed to the municipality, but a complete application has not yet been received.
Stage: Under review
Filed with the municipality and being reviewed.
Stage: Under appeal
A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
Stage: On hold
The municipality lists the application as on hold, for example while it waits for more material.
Stage: Approved
The application has been approved. Building may not have started.
Stage: Complete
Final approval has been given or the plan has been registered.149 Caplan Avenue is here.
Stage: Closed
The municipality has closed this application file. The record lists what was recorded.
Stage: Refused
The application was refused.

Sources

  1. 01City of Barrie page for this project — the current proposal, notices and reports
  2. 02Planning Applications (City of Barrie open data) — checked November 28, 2026

Contains information licensed under the Open Government Licence – Barrie. Open Government Licence – Barrie (version 1.0). Figures are the municipality’s records at the date checked; a later submission can change them.

How we draw the diagram

The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.

More