Development application D11-017-2026 · Ward 2

11 Simcoe Street

site plan

Stage: Under reviewOn the record: “UNDER REVIEW”Filed July 13, 2026
“THE SITE PLAN CONTROL APPLICATION WOULD FACILITATE THE DEVELOPMENT OF A NEW TWO-STOREY PERFORMING ARTS CENTRE WITH RESTAURANT (2,5860M2).”
The City of Barrie’s description, in its own words · checked November 28, 2026
The City’s file page

Where it stands

Stage from the City of Barrie’s status, November 28, 2026

Filed with the municipality and being reviewed.

Diagram of the zoning around 11 Simcoe StreetThe municipality's zoning polygons within about 140 metres of the file's recorded point; the point falls in a zone coded OS. A diagram, not to scale and not a survey: no building or design is drawn.C1-1C1-1C2-1Diagram, not to scaleCity of Barrie zoning and planning open data
Zoning areas around the site; the recorded point falls in OS today, which is the zone, not the proposal. Streets show as the gaps between zones. No building or design is drawn. File D11-017-2026.
25,860m²
non-residential floor area
City of Barrie record
1
application in this project: site plan
City of Barrie record
1
dated step on the record; the latest July 13, 2026
Checked November 28, 2026
How we know
Last checked November 28, 2026City of BarrieHow we know
Publisher
City of Barrie
Source dataset
Planning Applications (City of Barrie open data)
Official record
The municipality's own page for this project
Retrieved
November 28, 2026
Licence
Open Government Licence – Barrie (version 1.0) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by BarrieIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
BarrieIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “THE SITE PLAN CONTROL APPLICATION WOULD FACILITATE THE DEVELOPMENT OF A NEW TWO-STOREY PERFORMING ARTS CENTRE WITH RESTAURANT (2,5860M2)”. Latest dated step on the record: application received, July 13, 2026. File D11-017-2026. As of November 28, 2026 · City of Barrie

Data currency. Read from the City of Barrie source on November 28, 2026. The source publishes no last-edited date. Newest date on any record: November 20, 2026. Planning Applications (City of Barrie open data)

What is being asked

One application

11 Simcoe Street is a site plan on the City of Barrie's record proposing 25,860 m² of floor space in Ward 2. It is under review and has not been decided.

What is proposed

THE SITE PLAN CONTROL APPLICATION WOULD FACILITATE THE DEVELOPMENT OF A NEW TWO-STOREY PERFORMING ARTS CENTRE WITH RESTAURANT (2,5860M2).

The City of Barrie’s description of the application, as published.

The application

As the municipality records it.

  1. Site plan

    D11-017-2026

    Type
    Site plan (SITE PLAN)
    Status on the record
    UNDER REVIEW
    Received
    July 13, 2026
    Land use (City's words)
    OPEN SPACE
    Residential units (City's count)
    0
    Industrial, commercial and institutional gross floor area, m² (City's figure)
    25860

What has happened

Every dated item on the record
  1. Application received

    Site plan · D11-017-2026 · 2026

The record shows nothing dated after July 13, 2026; the next recorded step appears here when the municipality enters it.

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

Other projects within 1 km

Development in Ward 2
11 Simcoe Street and other planning files within 1 km11 Simcoe Street (ringed) and 32 other significant files on the City of Barrie's record within 1 km, over the zoning layer.Phase 1 - 39 Mary Stree &55 Dunlop Street West, Phase 2 -28 Maple Avenue and 49 Dunlop Street West (Formerly Known As 39-67 Dunlop St W & 35-37 Mary St) · Complete · 220 m39-67 Dunlop Street West & 35-37 Mary Street · Approved · 220 m49 Collier Street · Approved · 330 m149 Dunlop Street East · Under appeal · 390 m79 Collier Street · Closed · 410 m73, 75 & 79 Toronto Street · Under review · 410 m51-75 Bradford Street & 20 Checkley Street · Approved · 440 mMtsa- Allandale Area · Approved · 470 mLands in the Barrie-Oro-Medonte-Springwater Boundary Adjustment Act, 2025, and Other Adjacent Lands. · Approved · 470 m50 Worsley Street · Under review · 530 m34-50 Bradford Street · Approved · 540 m40 Bradford St (Aka 34, 38, 40, 44 & 50 Bradford Street) · Approved · 540 m67 Owen Street · Approved · 550 m34 Bradford Street · Approved · 550 m17 Sophia Street East, and 3,5,7,11 Mcdonald St, 58 & 60 Clapperton St · Approved · 570 m17 Sophia Street East, and 3, 5, 7, 11 Mcdonald Street and 58 & 60 Clapperton Street · Complete · 570 m185–205 Dunlop Street East · Complete · 590 m22, 28 & 34 Vespra Street and 97 & 101 Bradford Street · Approved · 610 m30 Sophia Street West · Approved · 620 m113 & 117 Bayfield Street and 6,8 & 12 Sophia Street East · Approved · 620 m113 & 117 Bayfield Street and 6, 8 & 12 Sophia Street East. · Approved · 620 m129 Collier Street · Approved · 630 m136 Bayfield Street; 14 Sophia St W & 113 & 115 Maple Ave · Approved · 650 m112 & 136 Bayfield Street, 14 Sophia Street and 113 and 115 Maple Avenue · Approved · 650 m217 Dunlop Street East · Approved · 720 m145 Bradford Street and 48 Ellen St · Under review · 820 m145 Bradford Street & 48 Ellen Street · Under review · 820 m76 Ross Street · Approved · 830 m196 & 202 Dunlop Street West · Approved · 840 m126, 136, 140 Bradford Street · Under appeal · 850 m204 Dunlop Street West · Approved · 890 m151 Bradford Street · Approved · 950 m1 km around the siteCity of Barrie open data
  • This project
  • Under review (4)
  • Under appeal (2)
  • Approved (22)
  • Complete (3)
  • Closed (1)
  • 1 km

Statuses as the City of Barrie publishes them; distances straight-line from the file’s recorded point · November 28, 2026

Around the site

11 Simcoe Street
Aerial view of 11 Simcoe Street, Barrie
Contains information licensed under the Open Government Licence – Ontario

Parks nearby

Community facilities nearby

Schools, heritage and transit

Nearest schools

Heritage register properties nearby(within 1.0 km, as the crow flies)

10 more within that distance; all of them.

Transit routes nearby(a published route path within 500 m, as the crow flies)

9 more within that distance; all of them.

Distances are between recorded positions, as the crow flies, not walking routes.

What the stages mean

The same words on every BarrieIQ project
Stage: Pre-application
Proposed to the municipality, but a complete application has not yet been received.
Stage: Under review
Filed with the municipality and being reviewed.11 Simcoe Street is here.
Stage: Under appeal
A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
Stage: On hold
The municipality lists the application as on hold, for example while it waits for more material.
Stage: Approved
The application has been approved. Building may not have started.
Stage: Complete
Final approval has been given or the plan has been registered.
Stage: Closed
The municipality has closed this application file. The record lists what was recorded.
Stage: Refused
The application was refused.

Sources

  1. 01City of Barrie page for this project — the current proposal, notices and reports
  2. 02Planning Applications (City of Barrie open data) — checked November 28, 2026

Contains information licensed under the Open Government Licence – Barrie. Open Government Licence – Barrie (version 1.0). Figures are the municipality’s records at the date checked; a later submission can change them.

How we draw the diagram

The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.

More